工程案例

工程案例

WM 酒店, 西贡

The newly opened WM Hotel is a three-story hotel situated along the shoreline of Sai Kung. It is a homage to the former fishing village and is surrounded by greenery and a waterfront.

Hong Kong Housing Society

Since technology is advancing rapidly, they initiated the renovation project of their corporate office located at the World Trade Centre to enhance the quality of its AV system.

A Renowned University in Hong Kong

One of the renowned universities in Hong Kong recognized the need to adapt to hybrid education and started deploying the Shure ceiling array microphone system in over 80 lecture and tutorial rooms.

Li Ka Shing, Faculty of Medicine, University of Hong Kong

The boardroom at Li Ka Shing, Faculty of Medicine, University of Hong Kong has been purpose built to seat approximately 300 people. 

CUHK Medical Centre

CUHKMC is the first “smart hospital” in HK. The project covers a 14-story building including over 20 meeting rooms, auditoriums, management offices, and nearly 500 digital notice boards, etc.

The Hong Kong University of Science and Technology​

As part of an enhancement to their MBA program, Vega provided Hong Kong’s first installation of the Barco weConnect system at The Hong Kong University of Science and Technology. 

Lohas Park Mall

Key Solutions:  Supply and Installation of LED walls, IP-based audio systems, digital signage, e-directory, BGM, and system control for the whole shopping mall. ...

K11 Musea

Key Solutions:  Supply and Installation of LED walls, IP-based audio systems, digital signage, e-directory, BGM, and system control. ...

Rosewood Hong Kong

​Key Solutions:  Video Systems,  Audio Systems, Control and Lighting Systems